在新建大型联合企业建筑安装工程中,常因忽视施工测量,以致阻碍了建筑方格网立轴线的通视,或测量标桩受到了损坏,严重影响工程质量或工程进度;有的在竣工后未作竣工测量就直接回填,窖井被掩没了,管线位置也无法找到,给生产带来很大不利。那末,在建筑安装工程中又怎样来考虑施工测量呢?施工组织设计和施工测量组织设计两者又存在着怎样的关系呢?本文就试图解答这些问题。
In the construction and installation of new large-scale conglomerates, due to the neglect of construction surveys, it has hindered the viewing of the vertical grid lines of the building grid or damaged the measured piles, seriously affecting the quality of the project or the progress of the project; some of them have been completed. Without the completion of the survey, it was directly backfilled, the pit was concealed, and the location of the pipeline could not be found, causing great disadvantages to the production. Then, how can construction measurement be considered in the construction and installation project? What relationship does the construction organization design and construction measurement organization design have? This article attempts to answer these questions.