江油发电厂、四川省电力局中心试验所及西安仪表厂共同商定,在江油发电厂一台200T/h高温高压燃煤锅炉的调节系统上采用MZ—Ⅲ型模件组装仪表装置。一方面,对仪表装置进行现场考核,另一方面,也提高了该炉的自动化水平。在参加单位的共同努力下,在电厂工人同志的配合下,经过将近三个月的工作,现场安装、调试均已完毕。给水(常规)调节系统和汽温调节系统已正式投入运行,运行情况正常,运行人员反应较好。燃烧调节系统中的负压调节系统、热负荷调节系统已可投入运行;送风调节系统,因主设备及其它原因尚未正式
Jiangyou Power Plant, Sichuan Provincial Electric Power Bureau Central Laboratory and the Xi’an Instrument Factory agreed to jointly use a model MZ-Ⅲ modular instrumentation at a 200T / h high-temperature and high-pressure coal-fired boiler conditioning system at Jiangyou Power Station. On the one hand, on-site assessment of instrumentation, on the other hand, also increased the level of automation of the furnace. With the joint efforts of participating units, with the cooperation of power plant workers, after nearly three months of work, on-site installation and commissioning have been completed. Feed water (conventional) regulation system and temperature control system has been officially put into operation, the normal operation of the operating staff better response. Burning control system in the negative pressure regulator system, heat load regulation system has been put into operation; air conditioning system, due to the main equipment and other reasons not yet formal