1号高炉易地大修工程已经开始筹划。本文从生产实际出发,结合目前世界上炼铁技术的发展和对1号高炉设备运行实际情况评价,探讨了易地大修的技术方案。作者认为,炉顶宜用串罐式无料钟装料设备,增加垂直探测器和炉身下部小型探测器,炉喉部增设冷却设备和强化炉身下部、炉腰、炉腹的冷却,出铁场改成环形,改进设备的维修,采用INBA法水冲渣、热风炉热媒式废气余热回收、TGR和干式除尘等技术。
No. 1 blast furnace easy overhaul project has begun planning. In this paper, starting from the actual production, combined with the current world development of ironmaking technology and the actual situation of the No. 1 blast furnace equipment operation evaluation, discusses the easy to overhaul technical solutions. The authors believe that the top of the furnace should be used with a bell-type bell-less charging equipment, increase the vertical detector and the lower part of the small detector, the furnace throat additional cooling equipment and strengthen the lower part of the furnace body, the waist, the belly cooling, out Iron field into a ring, to improve equipment maintenance, using INBA water slag, hot gas stove waste heat recovery, TGR and dry dust removal and other technologies.