论文部分内容阅读
观音阁水库是辽宁省已列入国家“七五”计划的重点工程,总库容21.68亿m~3,坝型为混凝土重力坝,混凝土总量223.0万m~3,是太子河流域以城市及工业供水、防洪为主,其次为农亩灌溉,并结合工农业用水发电的综合利用水库、水库建成后,可使本溪、辽阳、鞍山、营口等城市工业与城市用水的紧缺状况得到缓解,同时可使本溪、辽阳地区的防洪能力大大提高。国家与地方计划总投资9.87亿元。前期工作进展顺利,辽宁省水利水电勘测设计院已按要求于1985年10月编报了初步设计报告,目前松
Guanyinge Reservoir Liaoning Province has been included in the national “Seventh Five-Year Plan” key projects, with a total storage capacity of 2.168 billion m ~ 3, the dam type of concrete gravity dam, the total amount of 2.23 million m3 of concrete, is the Prince Edward River basin to urban and Industrial water supply and flood control, followed by irrigation and agricultural irrigation, combined with comprehensive utilization of power generation from industrial and agricultural water supply. After the completion of the reservoir, the shortage of industrial and urban water in Benxi, Liaoyang, Anshan and Yingkou cities can be alleviated, meanwhile, Benxi, Liaoyang area can greatly enhance flood control capabilities. The total investment of state and local governments is 987 million yuan. The preparatory work proceeded smoothly, Liaoning Provincial Water Conservancy and Hydropower Survey and Design Institute has requested in October 1985 prepared a preliminary design report, the current loose