论文部分内容阅读
1.重庆市长寿县白沙湾加筋土码头墙(见本刊总第6期),已于1985年7月竣工,经超荷载试验,证明码头墙受力情况良好,安全稳定可靠。该工程由重庆交通学院加筋土课题组设计,最大高度26米,填料为砂卵石,面板为矩形混凝土预制板及槽形钢筋混凝土预制板两种,拉筋采用工业废钢片及聚丙烯塑料带。竣工后于8月6日验收,工程质量达到良好标准。
1. Changshou County, Chongqing Baishawan reinforced earth wharf wall (see article 6), was completed in July 1985, the overload test to prove that the wharf wall stress is good, safe and reliable. The project is designed by the Chongqing Jiaotong University Reinforced Soil Task Group, the maximum height of 26 meters, filled with sand and gravel, the panel is rectangular concrete precast slab and trough reinforced concrete prefabricated two, the use of industrial scrap steel strip and polypropylene plastic . After the completion of the acceptance on August 6, the quality of the project to achieve good standards.