TRANSMISSION BEHAVIOR OF MUD-PRESSURE PULSE ALONG WELL BORE

来源 :水动力学研究与进展B辑 | 被引量 : 0次 | 上传用户:aliuyangba
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
In oil and gas industry, mud-pulse telemetry has been widely used to obtain directional data, drilling parameters, formation evaluation data and safety data, etc. Generally, the drilling mud in most current models was considered to be a single-phase fluid through which the mud pulses travel, despite the fact that the drilling mud is composed of two or more phases. In this article, a multiphase flow formula was proposed to calculate the mud-pulse velocity as mud solids and free-gas content change, and a mathematical model was put forward to simulate the dynamic-transmission behavior of the mud-pressure pulse or waves. Compared to conventional methods, the present model provides more accurate mud-pulse attenuation, and the dynamic-transmission behavior of drilling-mud pulses along well bores can also be easily examined. The model is valuable in improving the existing mud-pulse systems and developing new drilling-mud pulse systems.
其他文献
在运用数据包络分析方法评价行业企业相对生产率时,企业的生产能力、技术水平、人员数量以及产出量的差距越大,参评企业从评价结果中得出值得借鉴的信息越少。针对这种情况,本文
In this paper, decision mechanism of credit-risk for banks is studied when the loan interest rate is fixed with asymmetry information in credit market. We give
建立内生增长模型研究金融系统资源配置功能如何促进经济增长。结论:通过提高“创新平均成功概率”,增加“创新投资比例”、“储蓄转化比例”和储蓄率,金融系统能够促进经济快速
利用灰色关联评估理论,提出了“通用量化评测系统”这一新概念,为此,提出了两个定理和一个推论,并进行了证明推导。
在阐述了两岸贸易发展及直航必然性的基础上 ,提出了大陆北方 /台湾班轮航线直航制的航线方案 ,分析预测了航线货流量 ,比较了中转制和直航制两种航线方案下班轮的航次时间 ,
投资决策会因项目的价值、成本支出及时间的变化而不同 .不确定性投资条件下的不可逆投资过程及投资机会的可延迟性 ,使得投资机会类似于美式看涨期权 ,其时间选择权具有价值
供应链后勤系统的性能对供应链总体活动的有效性以及供应链中各成员的行为都将产生重大影响。本文在总结有关基准分析概念、理论、实证研究以及各学术观点的基础上,以供应链后
Evaluating land use efficiency is critical to the revision of general land use planning. An assessment indicator system for regional land use efficiency was est
Freeze-thaw erosion is the third largest soil erosion type after water erosion and wind erosion. Restricted by many factors, few researches on freeze-thaw erosi
The approaches adopted so far in China to calculate reserves of ore deposits have largely been dependent on polygonal methods, including a cross-section method