论文部分内容阅读
攀枝花矿区是全部依靠国内的力量建设的大型采选联合企业,自1965年开工建设以来,已先后建成兰尖铁矿、选矿厂、矿山机修厂、选钛生产试验厂以及矿区的部份民用住宅、市政建设等工程。兰尖铁矿废石溜井、朱家包包铁矿(以下称朱矿)等工程还在继续建设。矿区自1970年部份投产以来,不仅保证了攀钢生产的需要,并且少量地供给了水城、重庆等钢铁厂部份铁精矿,为攀枝花钢铁基地日益增长的经济效益做出了一定的贡献,这当中有成
Panzhihua Mining Area is a large-scale mining and dressing complex all relying on domestic forces. Since it started construction in 1965, it has successively built Lanjian Iron Ores, Concentrator, Mines Repair Factory, Titanium Production Test Plant and some civilian residences in the mining area , Municipal construction and other projects. Landslide iron ore waste slipway, Zhu Baotou iron ore (hereinafter referred to Zhu mine) and other projects are still continuing to build. Since the mine was partially put into operation in 1970, not only the need of Panzhihua Iron and Steel ’s production has been guaranteed, but also a small amount of iron ore concentrate supplied to the iron and steel works of Shuicheng and Chongqing has contributed a little to the growing economic benefits of the Panzhihua Iron and Steel Base. This is a success