论文部分内容阅读
在选矿前的矿石准备作业各工序中,破碎和磨矿耗能最高。提高此两项作业经济指标的合理愿望促使破碎磨矿作业数学模拟方面的研究工作得以发展,因为无论在破碎机设计还是在选择破碎机作业制度方面都使用这种模拟。许多人的研究工作,是要制定一种设计破碎腔形状和确定圆锥破碎机工艺指
In the pre-ore preparation operation of the various processes, the highest energy consumption crushing and grinding. The legitimate desire to increase the economic indicators for both operations has led to the development of research into the mathematical modeling of crushing and grinding operations because of the use of such simulations both in crusher design and in the selection of crusher operating systems. Many people’s research work is to develop a design crushing cavity shape and determine the cone crusher craft finger