论文部分内容阅读
岩巷掘进作为矿井建设的重要的环节,其掘进速度的快慢会影响到矿井建设周期的长短,再加之,我国的矿井产量呈现出逐年增加的趋势,岩巷掘进与开采成为一个矿井建设中主要的矛盾,为此,实现岩巷快速掘进十分必要。主要通过对影响岩巷快速掘进的因素的介绍,进而探讨了其提高岩巷快速掘进的措施,希望为从事岩巷掘进的工作人员提供帮助。
Rock tunneling, as an important part of mine construction, its speed of excavation will affect the length of the mine construction cycle. In addition, the output of mine in our country shows a trend of increasing year by year. Rock tunneling and mining have become the main part of mine construction Therefore, it is very necessary to realize rapid tunneling of rock roadway. Mainly through the introduction of the factors influencing the rapid tunneling of rock roadway, and then discussed the measures to improve fast tunneling of rock roadway, hoping to provide assistance to the staff engaged in rock tunneling.