论文部分内容阅读
某水利工程粘土心墙坝坝体填筑,受雨季和坝体度汛高程的提高等多种不利因素的影响,致使工期紧张,给质量管理控制带来难度。该粘土心墙坝是一座百米大坝,粘土心墙坝坝体填筑质量至关重要,加强坝体填筑过程质量检测与控制至为关键。经过建设各方精心组织研究,制定了严密的质量控制程序和检查、检测计划,并采取质量控制、进度控制等措施,严格进行现场施工管理,顺利实现了粘土心墙坝坝体填筑质量目标。
Due to the unfavorable factors such as rainy season and improvement of flood control elevation of the dam body, the construction of clay core wall dam of a water conservancy project will lead to the shortage of construction schedule and the difficulty of quality control. The clay core wall dam is a 100-meter dam. The quality of the clay core wall dam construction is of vital importance. It is crucial to enhance the quality inspection and control of the dam filling process. Through careful organization and study of all parties involved in the construction, strict quality control procedures, inspection and testing plans were formulated and measures such as quality control and progress control were taken to strictly carry out on-site construction management and successfully achieve the goal of filling quality of clay core wall dam body .