论文部分内容阅读
前言发射机从投产到逐渐能稳定地工作,要有一个相当长的周期,维护人员要不断地研究所发生的一切故障,分析它的原因,并采取各种技术措施,排除基建及安装过程中所留下的隐
Preface The transmitter from the operation to gradually be able to work steadily, there must be a very long period, maintenance personnel should continue to study all the faults that occurred, analyze its causes, and take various technical measures to exclude infrastructure and installation process The hidden behind