南四湖是南水北调东线第一期工程的主要调蓄湖泊之一。根据水量调节计算,其调蓄能力对全线的水量调度影响相当敏感。抬高上、下级湖蓄水位,可以增加调节库容,除能调节南四湖流域来水与充分利用当地径流减少弃水外,更重要的是能增加东线工程向北的供水量,提高北调供水的保证率。因此,规划将上级湖现状非汛期蓄水位由34.2米抬高至34.5米,可增加调节库容1.8亿立方米,将下级湖非汛期蓄水位自32.5米抬高至33.0米,可增加调节库容3.0亿立方米。
Nansi Lake is one of the main storage lakes of the first phase of the South-to-North Water Diversion Project. According to the calculation of water regulation, its storage capacity is quite sensitive to the impact of water regulation across the board. Raising the water level of the upper and lower reaches of the lake can increase the capacity of the reservoir. In addition to regulating the incoming water in the Nansi Lake Basin and making full use of the local runoff to reduce the amount of abandoned water, it is even more important to increase the water supply to the north of the East Line Project North transfer water guarantee rate. Therefore, it is planned to elevate the current non-flood season water level of the upper lake from 34.2 meters to 34.5 meters, increase the regulation capacity by 180 million cubic meters and raise the non-flood season water level of the lower lake from 32.5 meters to 33.0 meters to increase the regulation Storage capacity of 300 million cubic meters.