井冈山垦殖场修建了两座加筋堆石坝,即朱砂坝和洞背坝。朱砂坝位于井冈山茨坪东南6公里的朱砂河上,控制集雨面积22平方公里,最大坝高14.4米(溢流坝部分),坝顶长度31米,其中溢流段长23米。堆石方量2400米~3。该坝形成一座库容10万米~3的日调节水库,供朱砂水电站(装机125千瓦)和田垄里水电站(500千瓦)
Jinggangshan Rehabilitation Site built two reinforced rockfill dams, namely Zhusha Dam and Dongbei Dam. Zhusha Dam is located on the Zhusha River, 6 km southeast of Ciping, Jinggangshan. The controlled catchment area is 22 square kilometers, and the maximum dam height is 14.4 meters (overflow dam section). The crest length is 31 meters, and the overflow section is 23 meters long. The amount of stone piles is 2400 meters~3. The dam forms a daily regulating reservoir with a storage capacity of 100,000 m3, for the Zhusha Hydropower Station (125 kW installed) and Tian Tianli Hydropower Station (500 kW).