论文部分内容阅读
本文通过实例研究展示了在新的建筑项目施工过程中,热熔橡胶沥青防水膜出现的问题,并探讨了每个项目的设计和施工团队是如何应对所面临的挑战的。作者还会向我们展示,通过周密的现场勘测、建立试验模型(施工样板)、采用ASTM测试方法判定
This article shows the problems that occur in the hot-melt asphalt bitumen membrane during the construction of new construction projects through case studies and explores how the design and construction teams of each project can meet the challenges they face. The author will also show us that through careful site survey, the establishment of test model (construction model), using ASTM test method to determine