论文部分内容阅读
为达到国防部的综合高性能涡轮发动机技术计划(IHPTET)第一阶段的目标,普惠公司于1994年9月完成第一台全尺寸动力装置的试验。1994年9月进行的试验表明,该公司的XTE-65/2联合技术验证机(JTDE)已经达到并超过IH-PTET目标——推重比比现代先进技术发动机高出30%。
To meet the objectives of the first phase of the Department of Defense’s Integrated High-Performance Turbine Engine Technology Program (IHPTET), Pratt & Whitney completed the first full-scale power plant test in September 1994. Tests conducted in September 1994 showed that the company’s XTE-65/2 Joint Technology Verification Machine (JTDE) has met and exceeded the IH-PTET target – a 30% increase in weight ratio compared to modern advanced technology engines.