论文部分内容阅读
12月10日召开的华东电网2011年基建会议确立2012年与“十二五”基建总体目标,即率先实现“在国际上同行业中领先、在国内领先”工程建设质量和工艺目标;率先实现消除较大及以上工程建设安全质量事故目标;率先实现“标准工艺”在110 kV及以上输变电工程中的全面应用和工程100%优质工程率的工程创优目标。
On December 10, East China Power Grid Infrastructure Meeting 2011 established the overall goal of “12th Five-Year Plan” in 2012, which is to take the lead in realizing the goal of “leading in the same industry in the world and leading in China” The first to achieve the goal of eliminating safety and quality accidents in the construction of larger and above projects; and the first to realize the overall application of “standard process” in transmission and transformation projects of 110 kV and above and the engineering excellence goal of 100% high-quality engineering projects.