论文部分内容阅读
本文对新密电厂二期2×1000MW机组扩建工程厂外中水补给水系统及铁路专用线设计,从水水保持的角度对主体设计的两个方案进行了分析评价,得出的推荐方案与主体工程可研报告推荐的方案一致;通过对主体工程推荐方案水土保持分析与评价,进行水土保持补充设计。通过实施本水土保持方案能够达到水土流失防治二级标准。
In this paper, the design of 2 × 1000MW unit expansion project of Xinmi Power Plant and the design of special water supply system of the railway line are discussed. The two schemes of the main design are analyzed and evaluated from the perspective of water and water conservation. The main project feasibility study report recommended the same program; through soil erosion analysis and evaluation of the main project recommendation program, soil and water conservation supplementary design. Through the implementation of the soil and water conservation program to achieve soil and water loss control two standards.