四、施工前的准备工作(一)组织管理工作准备修梯田时,不论采用人工还是机械修筑,都要事先把劳力、工具,机械、费用等组织安排好。施工单位应有一名负责人参加,以便及时解决施工期出现的问题。技术员要将地块逐条规划,定出地埂线,并检查施工质量。(二)定埂线的方法1、定基线方法:在一条坡面的正中,从上而下顺坡与等高线正交,划一条线,然后根据地面坡度和要求的田面宽度,确定田宽相应的坡面长度,并逐段量取,分别得到若干点,
IV. Preparation Before Construction (I) Organization and Management Work To prepare for the terraced fields, labor, tools, machinery, expenses and other organizations should be arranged in advance whether using artificial or mechanical construction. The construction unit should have a person in charge to participate in order to promptly solve the problems arising during the construction period. The technicians should plan the plots one by one, set the line and check the construction quality. (B) the fixed line method 1, set the baseline method: in the middle of a slope, from top to bottom along the slope and the contour line orthogonal, draw a line, and then based on the slope of the ground and the required width of the field to determine the field Wide corresponding slope length, and take the amount by paragraph, were a number of points,