论文部分内容阅读
自三中全会以来,我国的经济发展很快。随着经济的迅速发展,各行各业对通信的要求越来越高,对信息量的要求越来越大。去年全国长话出现全面高涨,机线全面紧张,设备超荷运转。乐山局长话的状况与全国长话大致相似。如何采取措施解决乐山地区的长话紧张状况已成为当务之急。 作为应急措施,一是靠挖潜,二靠采用新技术新设备。这里说的挖潜是指提高现有明线的复用指数,增加电路,新技术新设备是指采用环路设备,增加直达电路,增开简易半自动,逐步实现区内长话自动交换。当然,要根本解决这个问题还是要加紧微波、光纤、数字通信的建设,逐步向综合数字通信网过渡。
Since the Third Plenary Session, the economy of our country has developed rapidly. With the rapid economic development, all walks of life are increasingly demanding on communication, and the demand for information is getting bigger and bigger. Last year, there was an overall surge in long-distance calls across the country, a complete tension in the line and overloading of equipment. The situation of Secretary Leshan’s words is similar to that of the national long story. How to take measures to solve the long-distance tension in Leshan has become a top priority. As a contingency measure, one is to tap the potential and the other to adopt new technologies and new equipment. The tapping potential mentioned here refers to increasing the multiplex index of the existing open wires. Adding new circuits and new technologies refers to adopting a loop device to increase the direct circuit, increasing the number of direct circuits and increasing the number of long-distance exchanges. Of course, to fundamentally solve this problem, we must step up efforts in the construction of microwaves, optical fibers and digital communications and gradually move toward the integration of digital communications networks.