结合工程量清单报价的特点,实施工程量清单报价以后的工程报价应根据企业定额并采用不平衡报价法等技巧进行论述,以提高中标的机率。工程中标后,应对工程成本费用要素,如人工费、材料费和机械费等进行严格管理,对工程施工过程中发生的设计变更或其他与合同和工程量清单不一致的地方进行记录并签证,为以后的索赔作准备。同时,本文还强调了应进行合理的索赔。
Combined with the characteristics of the quotation of BOQ, the project quotation after the quotation of BOQ should be discussed according to the quota of enterprises and using the method of unbalanced quotation to enhance the probability of winning the bid. After the project has won the bid, the cost of construction costs should be strictly managed, such as labor costs, materials costs and mechanical expenses, and so on. Records and visas shall be made to the design changes or other inconsistencies with the contract and engineering quantity lists during the construction of the project. Prepare for future claims. At the same time, this article also emphasizes that reasonable claims should be made.