论文部分内容阅读
2012年8月7日,跨龙华路40m+56m+40m现浇连续梁第1个A节段的浇筑作业顺利完成。该连续梁为现浇三跨预应力混凝土箱梁,桥跨布置为40m+56m+40m,设计方量为1 843m3。
On August 7, 2012, the first A segment of 40m + 56m + 40m cast-in-situ continuous girder spanning Longhua Road was successfully completed. The continuous beam is a cast-in-place three-span prestressed concrete box girder with a span of 40m + 56m + 40m and a designed square of 1 843m3.