论文部分内容阅读
在山峦起伏的辽东山区,战斗着一支地质勘探队伍,它就是辽宁冶勘一〇一队钻探二分队.这个分队的一〇五号钻机,过去由于连年完不成生产计划,人们都叫它“老牛钻”.近一年来,这个机台的全体职工在学习无产阶级专政理论运动中,端正了思想政治路线,改变了精神面貌,调动了大干社会主义的积极性,使钻探生产转为稳产高产.75年1~9月份总进尺5895米,比74年同期增长85%.平均台月效率为773米,比计划指标提高了35.6%,与74年同期相比提高了63.4%.纯钻时间为73.5%,小时效率达1.46米.单位成本显著下降,比计划成本降低24.6%,与74年同期相比降低34.1%.提前128天完成了全年国家钻探生产任务,实现了优质、高效、安全、低耗.人们都高兴的说:“老牛钻’翻了身,变成了’高效钻’”.
In the mountainous Liaodong mountainous area, fighting a geological prospecting team, it is Liaoning Metallurgical prospecting team 108 drilling unit of this unit of 105 drilling rig, in the past due to year after year can not finish the production plan, people call it In the past year or so, all the workers and staff of this machine have rectified the ideological and political line, changed the mental outlook, mobilized the enthusiasm of a lot of socialism, and made drilling and production turn in the course of learning the theory of proletarian dictatorship. For a stable and high yield .1975 total footage of 5895 meters from January to September, an increase of 85% over the same period in 74. The average monthly efficiency of 773 meters, an increase of 35.6% over the planned target, compared with the same period in 74 increased by 63.4%. The pure drilling time was 73.5% and the hourly efficiency was 1.46 meters. The unit cost decreased significantly, which was 24.6% lower than the planned cost and 34.1% lower than the same period of 74. Completed annual national drilling production task 128 days ahead of schedule, achieving high quality Efficient, safe and low consumption people are happy to say: “old cow drill ” rolled over and turned into a “efficient drilling ”.