论文部分内容阅读
黄河石头庄溢洪堰,是控制洪水,保证陕州流量两万三千秒公方、争取两万九千秒公方时不生溃决的伟大建设工程,同时也是黄河治本工程的开端,变害河为利河的主要关键。当行政布置了这一艰巨的任务以后,工会为保证这一工程在预定时期内顺利完成,于六月二日在工地成立了工区工会,除设主任、副主任外,并有办公室和组织、文教、劳保等科,全部干杂人员由十三人组成,直接领导平原工程队、河南工程队、工程处机关工会、山东砌石大队、航运工会、第五测量队、东阿工会、平原机动工程
Yellow River Stone Zhuang overflow weir, flood control is to ensure that the flow of 23,000 square kilometers in Shan state, for the twenty-nine thousand second public square, a great construction project, but also the beginning of the Yellow River permanent cure project, change the river is The main key to the river. After the administrative arrangement of this arduous task, in order to ensure the successful completion of the project within a predetermined period, the trade union set up a work area union on the site on June 2, in addition to its director and deputy director, as well as offices and organizations, Culture, education, labor protection and other subjects, all dry and mixed personnel from thirteen people, led directly by the plain engineering team, Henan engineering team, the Agency branch of labor unions, masonry in Shandong, shipping unions, the Fifth Survey team, East A trade unions, engineering