从龙马水电站建设项目环境保护责任制落实、环保资金、环保监测、监督及生态环境保护措施、水土保护措施、水环境保护措施、固体废物处置措施、大气环境保护措施、声环境保护措施方面阐述环保“三同时”在工程的具体实施,使生态恢复及保护植物迁地保护取得效果,新增水土流失得到防治,项目区及周边直接影响区范围内的生态环境得到明显的改善,环境效益显著。
From the implementation of the Longma hydropower project environmental responsibility system implementation, environmental protection funds, environmental monitoring, supervision and ecological environment protection measures, water and soil conservation measures, water environmental protection measures, solid waste disposal measures, atmospheric environmental protection measures, environmental protection measures to explain aspects of environmental protection “Three Simultaneity ” will be implemented in the project so that ecological restoration and plant ex-situ conservation will be effective and new soil and water loss will be prevented and controlled. The ecological environment in the project area and directly affected area around the project area will be significantly improved, and environmental benefits Significant.