大桥局四处承建的京九铁路孙口黄河大桥南岸工程。自1992年进点经过两年艰苦努力,施工生产取得了重大成绩,已完成产值16858万元,完成混凝土68042m~3,全桥#8-#67台的基础工程及墩身帽全部完成。预应力梁已制206片,架梁128片,8孔钢梁已架设2.3孔。在这两年多的时间内,取得这么大的成绩,除
The Beijing-Kowloon Railway, Sunkou, and the south bank of the Yellow River Bridge, which are under construction by the Bridge Bureau. After two years of arduous efforts since 1992, the construction production has achieved significant results. The output value has reached 168.58 million yuan, the concrete has been completed at 68042 m-3, and the foundation project and pier body caps for the #8-#67 full bridge have been completed. Pre-stressed beams have been made 206 pieces, 128 pieces of beams, and 8-hole steel beams have been erected with 2.3 holes. In more than two years, such great achievements have been achieved.