滑动模板施工,经常在40°F(4.5℃)以下进行。为了保证混凝土的质量,建议采取下列几种措施:1.采用Ⅲ型加气水泥;2.在模板内将混凝土加热到70°F(21℃);3.采用保温棚养护,使棚内温度保持24小时70°F(21
Sliding formwork is often performed below 40°F (4.5°C). In order to ensure the quality of concrete, it is recommended to take the following measures: 1. Use Type III aerated cement; 2. Heat the concrete to 70°F (21°C) within the formwork; 3. Maintain with a shed to maintain the temperature inside the shed. Keep 24 hours at 70°F (21