再论立堵截流的规律

来源 :陕西水力发电 | 被引量 : 0次 | 上传用户:sniperxp
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我国的水利水电建设自建国以来得到蓬勃的发展.1985年黄河三门峡工程采用机械化立堵抛石截流,取得了成功.其后,黄河上游盐锅峡、青铜峡、刘家峡、龙羊峡水电工程也相继巧锁黄龙.丹江口工程则成功地腰斩了汉江,从而创造了岩基河床立堵以及软基河床平立堵的经验.通过科学试验和总结经验,葛洲坝工程于1981年元月终于在流量4400~8000m~3/s、流速达7m/s、落差3.23m的情况下,截断了举世瞩目的长江,取得了辉煌的成就. China’s water conservancy and hydropower construction has been booming since the founding of the country in 1985 the Yellow River Sanmenxia project using mechanized plugging lithotripsy and achieved success after which the upper Yellow River Gorge, Qingtongxia, Liujiaxia, Longyangxia hydropower project Successively clever lock Huanglong Danjiangkou project succeeded in cutting the Han River, thus creating a bedrock of rock-based riverbed and soft bed-based plugging experience through scientific experiments and lessons learned, Gezhouba project in January 1981 finally in the flow 4400 ~ 8000m ~ 3 / s, the flow rate of 7m / s, the gap of 3.23m, cut off the world-renowned Yangtze River, and achieved brilliant achievements.
其他文献
万安水利枢纽于1980年经原电力工业部决定采用初期运用方案,当时工程已列为停缓建项目,工程建设处于半停顿状态.1981年8月国家计委再次批准复工,仍因投资不足工程进展缓慢,
通过构建二元Logistic模型,分析了贵州喀斯特地区农户参与造林行为的影响因素。结果表明:户主的性别、每月赶集次数、农业收入对于农户参与造林行为的影响极显著,在1%的水平
应美国食品药物管理局(FDA)的邀请,中国商检代表团于1997年2月访问了FDA,与FDA总部人员就中国对美出口蘑菇罐头自动扣留问题进行了全面交涉。 1989年 2月开始在美国发生数起
遵照中央防总办公室负责同志的“搞清岳城水库特大洪水的预见期”的指示,最近我们就岳城水库1963、1956年的大水资料,进行了作业预报演习,从资料收集到产汇流计算直至水库调
克尔维尔坝位于美国德克萨斯州的瓜达卢普河上,原是一座钢筋混凝土板护面的粘土心墙坝,于1980年建成。 1982年10月发生洪水漫顶,该坝混凝土护面板发生大量裂缝和位移,并使反
广西那板、龟石和临江三个水电站的6台HL263-LJ-134型水轮机,由于选型不合理和转轮加工质量差等原因,出力长期较低。1982~1984年经过先后采取更换转轮和修磨叶型等措施之后,6
本文讨论一种新的模拟系统,叫做 CYTHERE 3D。这种新模式将完整的二维和三维浅水波动方程耦合在一起,分别用现有的 CYTHERE ESI 和 ODYSSEE求解。采用分裂算子法,从而使联结
引滦工程是解决天津、唐山二市工农业用水的跨流域输水工程,潘家口水库是引滦的骨干工程。它将滦河水量进行多年调节。人们的印象里,滦河是一条清水河流。但情况并非完全如
本文介绍了葛洲坝大江围堰拆除爆破对二江运行机组的影响,并对机组安全运行的振动控制标准进行探讨. This paper introduces the influence of demolition blasting of Daji
当今,电脑数字动画以快速的工作效率、震撼的视觉冲击效果逐渐占领了动画市场,传统的二维动画也占据着一席之地,其他类型的动画分得的蛋糕就原来越少,在这种形式下生产出来的