木文是《云南水力发电》1987年第4期中“关于漫湾水电站设计方案的几点想法”一文的补充。着重研究大坝与厂房下游河床的冲刷和保护。文分两部份:一、概述;二、结合漫湾水电工程的一些问题。一、概述混凝土溢流坝过堰水舌下泄的消能方式,大体上有三种基本形式: 1.坝面贴附水舌的水跃消能,一般均带有钢筋混凝土底板和边墙的消力池,池的末端常加一小坝,见图1.1,促使水跃在消力池内完成,没有挑流的过程。多应用于低
Mu Wen is “Yunnan Hydropower” 1987 the fourth period in “on the Manwan Hydropower Station Design Scheme several ideas,” an article to supplement. Emphasis will be placed on the scouring and protection of the riverbed downstream of the dam and plant. Article is divided into two parts: First, an overview; Second, with some problems Manwan Hydropower Project. First, an overview of concrete spillover dam weir water tongue dissipated energy dissipation methods, there are basically three basic forms: 1. Dam attached to the water tongue of the tongue jump energy dissipation, are generally with reinforced concrete floor and the wall of the consumer Force pool, the end of the pool often add a small dam, see Figure 1.1, prompting the water jump in the stilling pool to complete, there is no pick flow process. Multi-applied to low