本文从南水北调安阳段渠道机械化衬砌施工中遇到的影响工程质量的问题入手,重点介绍在砂滤层(5cm厚)补水的时机及措施,干燥多风季节混凝土(10cm厚)补水机理、时机和工程效果。
This article starts from the problems that affect the quality of the project encountered in mechanized lining construction of Anyang section of South-to-North Water Diversion Project. It focuses on the timing and measures of water supply in sand filter layer (5cm thick), the mechanism of water supply in dry windy season concrete (10cm thick) Engineering effect.