我厂冷作车间以工人为主体的“三结合”小组自力更生、奋发图强完成了机械化模具库的设计和安装(见图1)。解决了过去管理模具的老大难——搬抬吃力、占地面大、使用不便;还比行车、铲车优越(行车无法从架内取模,铲车占地面大、高度受限制);也为库房管理自动化开辟了途径。 该库房布局如图2所示(可放置近八百套模具,以前只能放一百多套)。它由模具
The workshop of “Three Combinations” with the workers as the main body in our cold work workshop relied on our own efforts to complete the design and installation of the mechanized mold base (Figure 1). Solve the old mold of the past to manage the mold - lifting laborious, accounting for the ground, the use of inconvenience; than driving, forklift superior (driving can not take mode from the frame, the forklift accounted for the ground, the height is limited); Warehouse management has opened the way to automation. The warehouse layout shown in Figure 2 (can be placed nearly 800 sets of molds, previously only put more than 100 sets). It consists of molds