高速度地实现山地手工操作机械化半机械化——地质部探矿工程司郭少英司长在贵州苗岭山地工作现场会议上的总结

来源 :探矿工程 | 被引量 : 0次 | 上传用户:luwei2431231
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我们的会议今天胜利结束了,到会的有十二省代表304人,共历时八天。这次会议的目的是解决山地工作高速度地实现手工操作机械化半机械化的问题。我们通过大交流、大配套、大推广、大提高的作法,将各地所创造的新工具、新技术、新经验,迅速使用于生产。整个会议的开法,概括起来是五个字:就是边看(现场表演)、边听(经验介绍)、 The victory of our meeting ended today with 304 delegates from 12 provinces attending the meeting, which lasted for eight days. The purpose of this meeting was to solve the problem of mechanization and semi-mechanization of manual operation at a high speed in mountainous areas. We have used the new tools, new technologies and new experiences created in various places rapidly for production through large-scale exchanges, large-scale support, big promotion and great improvement. The whole meeting of the opening method, summed up in five words: that is, watching (live performances), while listening (experience introduction),
其他文献
The spontaneous emission spectrum in the optically excited single-electron-tunneling device coupled to the side dot is analytically found to be determined by th
受编纂时代的局限,《汉语大词典》在释词书证的引用方面存在诸多缺失。文章以敦煌邈真赞文书词语为研究对象,从提前书证年代和补充孤立书证两个方面就《汉语大词典》的缺失予
原文××县人民政府办公室关于询问××中学违规收费情况的函×府办函[2004]10号县教育局:据《××晚报》2004年×月×日二版报道,我县××中学连续两年违规收取“建校费”达
第一部份 前言 1 桿柱在采矿工业中应用现状: 桿柱是一种新型的支柱,它是利用对岩石的加固作用和悬挂作用来维护工作面的,因此它和普通起支承作用的支柱是不同的。 由于桿柱
我队在58年建队初期,山地浅井工程使用普通的钩子吊土(石),很容易发生吊筐脱钩坠井事故,对井下工人的安全是个很大的威胁,因此我们先后使用 At the beginning of our team’
大学语文的教学要凸显学生的专业特色,通过优化课堂设计,凸显专业因素,提高学生学习的主动性。开展与学生专业相关的探究性课题,培养学生的创新能力。做好大学语文与专业相结
公文写作作为一门课程,已经登上大学讲堂。在大学公文写作教学中,已经积累了一些成功的经验,但也存在一些值得注意的问题。为了提高教学的质量和效率,就有关问题谈几点想法,
我队几年来在党和上級的导領下,通过广大职工的积极努力,基本上完成了国家交給的生产任务,滿足了矿山生产建设的需要。但是,由于领导上存在着严重的右傾保守思想,对几年来完
We synthesize continuous solid solutions with monophasic zircon-type structure of vanadates of formula YxBi0.95-xVO4:0.05Dy3+(x = 0–0.95) using a combined meth
研究主要巷道及其两侧煤柱的压力变化,包括一侧、两侧采动及工作面朝向或背离主要巷道回采时的压力变化。 To study the pressure changes of the main roadway and the pil