Characteristics of run off and sediment generation of forest vegetationon a hill slope by use of art

来源 :Journal of Forestry Research | 被引量 : 0次 | 上传用户:stcheer
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
We studied the impact of forest vegetation on soil erosion,surface runoff, and sediment generation by using field simulated rainfall apparatus. We measured runoff and sediment generation of five 4.5 × 2.1m runoff plots (a bare soil as a control; two Pinus tabulaeformis forestplots and two Platycladus orientalis forest with row spacing of 1 m × 1m and 1.5 m × 1.5 m, respectively) in Beijing Jiu Feng National ForestPark under three rainfall intensities (0.42, 0.83, 1.26 mm per minute).Forest vegetation significantly reduced soil erosion and sediment yield.Mean total runoff volume in the four tree stand plots was 93% of that inthe control plot, demonstrating the limited effectiveness of forest vegetation in runoff control. With increasing rainfall intensity, runoff reductionin forest plots declined from 28.32% to 2.1%. Similar trends in runoff coefficient and the relationship between runoff volume and rainfall duration was observed. Mean total sediment yield and mean sediment yield reduction rate under different treatments was 55.05% and 43.17% of those in the bare soil control plot, respectively. Rainfall intensity playedan important role in runoff and sediment generation processes, and had agreater impact on runoff than on soil erosion and sediment generation.When considering several factors in runoff and sediment transport processes, the P. tabulae form plot with row spacing at 1 × 1 m had a greater effect on soil and water conservation than did other forested plots. We studied the impact of forest vegetation on soil erosion, surface runoff, and sediment generation by using field simulated rainfall apparatus. We measured runoff and sediment generation of five 4.5 × 2.1m runoff plots (a bare soil as a control; two Pinus tabulaeformis forestplots and two Platycladus orientalis forest with row spacing of 1 m × 1 m and 1.5 m × 1.5 m, respectively) in Beijing Jiu Feng National Forest Park under three rainfall intensities (0.42, 0.83, 1.26 mm per minute). Forest vegetation significantly reduced soil erosion and sediment yield.Mean total runoff volume in the four tree stand plots was 93% of that inthe control plot, demonstrating the limited effectiveness of forest vegetation in runoff control. With increasing rainfall intensity, runoff reductionin forest plots declined from 28.32% to 2.1%. Similar trends in runoff coefficient and the relationship between runoff volume and rainfall duration was observed. Mean total sediment yield and mean sediment yield red ufall rate under different measures was 55.05% and 43.17% of those in the bare soil control plot, respectively. Rainfall intensity played important role in runoff and sediment generation processes, and had agreater impact on runoff than on soil erosion and sediment generation. several factors in runoff and sediment transport processes, the P. tabulae form plot with row spacing at 1 × 1 m had a greater effect on soil and water conservation than did other forested plots.
其他文献
化学反应使用各种各样的溶剂 ,但可供使用的良好溶剂的种类有限。熔融电解质是只含离子的离子液体。细心选择合成起始原料可制得在室温或低于室温的温度下呈液态的离子液体。
为了适应修理工作的需要,我在几年前搞了一个供汽车发动机进行三保后试车用的手提式电器检验箱,内部接线如下图所示。本检验箱通过几只开关(K_1~K_4均为车用推拉式两档灯开关
罗伯特·鲍许股份有限公司(RObert·BoschGmh(?))是西德一家著名的汽车电器电子设备、日用电器、电动工具制造公司,总部设在西德南部城市斯图加特。该市不仅以本茨为代表的汽
小儿肺炎是儿科的常见病、多发病.主要表现为咳嗽、呼吸急促等呼吸道症状,但以腹痛为主诉的就诊者并不少见.现将30例分析如下.本院儿科门诊自1995年8月至1998年8月以腹痛为主
在伟大领袖毛主席的英明领导下,我国社会主义建设事业突飞猛进,日新月异,工农业生产高速度的向前发展,电力负荷迅速增长,供需矛盾日益尖锐。尽管有不少大容量新机组相继投产
苏联汽车拖拉机材料研究所和克列明楚格汽车厂一起,研制出两种廉价工业用合金结构钢20XFHMTA和20XFHMO(见表)。这两种钢适于制造模数为6~14和4~8mm的汽车渗碳和碳氮共渗齿轮,
Based on the experiments, the standard enthalpy△H■of the possible pyrolysis reactions of the carbon matrix precursor toluene was investigated by means of DFT
一、基本情况1957年冬谭震林书记在河南沙颍河治理工作座谈会上指示,必须广泛开展群众性水利工程的观测研究工作,来解决水利化运动中提出的一系列的新课题。为了贯彻这一指
沈阳电力建设局在7月13日至19日召开了三级干部会议,总结了上半年的工作,部署了下半年的任务。这次会议的中心议题是计划落实问题。会议根据“全国一盘棋”的方针,坚决缩短
新安江水电工程局已提前三十五天完成了今年的工程建设计划。到11月26日止,已完成全年浇筑大坝和厂房混凝土计划的100.1%,完成全年安装钢管计划的105.3%,完成全年开挖石方计