论文部分内容阅读
本文从工作实际出发,总结了电气化铁道枢纽地区供电开闭所由于全所停电检修困难而采取越区供电的施工组织方法。
Based on the actual working conditions, this paper summarizes the construction organization method of the power supply opening and closing of the electrified railway hub area because of the power outage and the difficulty of maintenance.