论文部分内容阅读
“双加工程”是国家“八五”末、“九五”初期为加大投资力度、加快技术改造步伐而决定投资实施的技改工程项目.白鸽公司“双加工程”改造的主要内容是对陶瓷磨具生产系统进行全面彻底的改造.关键工序引进国外最先进的单台设备和技术,大部分配套设备立足国内制造,并对部分老设备进行改造,着力增加数控机床配套的高档磨具产品的产量.
“Double Plus Project” is a technological transformation project decided by the government to invest in the implementation of increasing investment and accelerating the pace of technological transformation at the end of the “Eighth Five Year Plan” and the “Ninth Five-Year Plan” period. The main contents of the “Double Plus Project” transformation of Baige Company It is a thorough and complete transformation of the ceramic abrasive production system. The key processes introduce the most advanced single equipment and technology from abroad, most of the supporting equipment is based on domestic manufacturing, and some old equipment is transformed, and efforts are made to increase the high-grade grinding machine supporting CNC machine tools. With the output of the product.