论文部分内容阅读
1工程概况四女寺枢纽工程位于山东省德州市德武区四女寺村东,坐落在卫运河尾端、漳卫新河和南运河的入口处,是一座以防洪为主兼有通航、供水的大型水利枢纽。四女寺枢纽南进洪闸是分泄漳卫河洪水、沥水的控制工程。该闸建于1958年,经历了1963年50年一遇的特大洪
1 Project Overview Si Nisi Junction Project is located in the east of Si Nisi Village, Dewu District, Dezhou City, Shandong Province. It is located at the end of Wei Canal, at the entrance of Zhangwei New River and Nan Canal. It is a flood- Large-scale water control project. Four women Temple junction South flood gate is diverted Zhang Wei flood, drainage control project. The gate was built in 1958, experienced a 1963 50-year flood event