内蒙古通辽玻璃厂建设工程是国家建材工业的重点工程,采用了先进的浮法生产工艺,设计能力为年产浮法玻璃110万标准箱。该工程于1976年6月开工,1979年5月开始安装设备,1982年6月末完成全厂无负荷联动试车,9月10日点火烤窑,10月18日开始拉引玻璃,一次试产成功,经主管部门批准,于1982年12月1日正式投产。今年六月进行了正式验收。验收认为:通辽玻璃厂工程的建设,基本上是按照国家基本建设的程序进行的,工程设计和施工安
The construction project of Tongliao Glass Plant in Inner Mongolia is a key project of the national building materials industry. It adopts an advanced float production process and the design capacity is annual production of 1.1 million TEUs of float glass. The project was started in June 1976 and equipment was installed in May 1979. At the end of June 1982, the whole plant was commissioned with no-load linkage test. On September 10th, the kiln was ignited. On October 18, the glass was pulled, and the trial production was successful. With approval from the competent authority, it was formally put into operation on December 1, 1982. In June this year, it was officially accepted. Acceptance of the opinion: The construction of the Tongliao glass factory project is basically carried out in accordance with the national basic construction procedures, engineering design and construction safety.