分析了电机定转子磁场中心高差和泵叶片上下间隙在机组运行前后的差异及其影响因素,确定机组有关固定件与转动件的合理安装高差及其测量校核调整方法,以保证运行时磁场中心高差合格和上下叶片间隙均匀。指出安装时应保证转动件与固定件之间有足够顶车间距的部位。
The differences of center height difference between stator and rotor of the motor and the upper and lower clearances of pump vanes before and after the operation of the unit were analyzed and the reasonable installation height difference of the fixtures and rotating parts of the unit and the calibration check and adjustment method were determined so as to ensure the operation Magnetic center height difference and uniform blade up and down. Pointed out that the installation should ensure that there is sufficient space between the rotating parts and the fixed roof spacing parts.