日照市水利养殖场工程南北主堤长450m,东西副堤长600m,副堤向东设挡浪坝300m。工程建设时采用了浆砌石压力式挡土墙防护外坡,内坡均为土沙堤梯形断面结构。运行多年来,由于波浪淘刷严重,墙体老化失
Rizhao City water conservancy farm project main north-south main embankment 450m, east-west vice embankment length 600m, the embankment set east blocking wave dam 300m. Construction using a masonry pressure retaining wall protection of the outer slope, the inner slope of the trapezoidal trapezoidal cross-section structure. Over the years of operation, due to serious wave scouring, wall aging loss