昆明发电厂装机容量为 2x100MW,机组投产时的技术水平和自动化水平不高,已运行了十多年,设备老化问题逐步显现,设备健康水平和可靠性已呈现逐渐降低的趋势。而每年用于设备大修、维修、更改项目的资金是有限的,如何合理使用大修更改资金和单项计划资金,并保证大修
The installed capacity of Kunming Power Plant is 2x100MW. The technical level and automation level of the unit when it is put into production are not high. It has been in operation for more than 10 years. Equipment aging problems have gradually appeared, and the health level and reliability of the equipment have been gradually reduced. The funds used for equipment overhaul, maintenance and change projects are limited each year. How to rationally use overhaul funds and individual project funds and guarantee overhaul?