龙泉市瑞样一级电站位于龙泉市南部巨江大溪水系梅溪支流瑞祥溪上,总装机2×6000kw,是一座以发电为主的高水头混合式水电站.该电站主体工程于1984年10月破土动工,1988年10月28日进入试运行,跨流域二期引水工程于1992年3月动工,1993年4月建成通水,跨流域三期引水工程于19
Located in Ruixiangxi, Meixi tributary of the Ju River in the Great River in the south of Longquan City, the first-class power station of Longquan City Ruishu is equipped with a total installed capacity of 2 × 6000kw. It is a high-head hybrid hydropower station mainly based on power generation. The main project of the power station broke ground in October 1984 and entered into trial operation on October 28, 1988. The second phase of diversion project started in March 1992 and the third phase of diversion project was completed in April 1993 at 19