论文部分内容阅读
瑞士瓦尔·德斯·迪克斯水库最大库容为4亿m3。为优化利用水库的水能,格兰迪·迪克斯恩斯SA公司在布德朗建造一座新的地下电站,扩充了它的装机容量。目前ABB公司正在安装这个电站的3台由冲击式水轮机驱动的465MVA同步发电机,每级33.2MVA,是世界最高额定容量的冲击式水轮发电机。发电机为全水冷,仅有两个轴承。
The largest storage capacity of the Swiss Val d’Addresse Reservoir is 400 million m3. In an effort to optimize the use of reservoir hydropower, Grandi-DixSain SA has built a new underground power station in Buderang to expand its installed capacity. ABB is currently installing three of its 465MVA synchronous generators driven by an impulse turbine at 33.2 MVA each and is the world’s highest rated impulse turbine generator. The generator is water-cooled with only two bearings.