论文部分内容阅读
Sneltram高速电车乌得勒支到Nieuwegein段正在进行全面的现代化改造,其中包括新线路的建设。该段线路1983年开通运行,全程21km,沿途设24个车站。在此次改造项目中,26列安装有Holec牵引装置的SIG轻轨车辆由位于海伦芬的VDL公司负责翻
The Sneltram high-speed tram Utrecht to the Nieuwegein section is undergoing a full modernization, including the construction of the new route. The section of the line opened in 1983, full 21km, along the way set up 24 stations. In this retrofit project, 26 light-rail vehicles equipped with Holec traction devices were commissioned by VDL at Heerenveen