预应力混凝土管桩的发展

来源 :建筑技术 | 被引量 : 0次 | 上传用户:yu_jixing
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
丰台桥梁工厂用离心法生产混凝土管桩,已有近三十年的历史。1966~1970年发展为预应力混凝土管桩,在技术经济上又向前迈进了一步。如生产40万米预应力离心混凝土管桩代替钢管桩,估计可节约钢材3万余吨;代替普通离心混凝土管桩,也可节约钢材1万余吨。可见,采用预应力混凝土桩省钢省钱,意义重大。预应力混凝土桩的某些技术性 The Fengtai Bridge Plant has produced concrete piles by centrifuging for nearly 30 years. The development of prestressed concrete pipe piles from 1966 to 1970 was a step forward in terms of technology and economy. For example, 400,000 meters of prestressed centrifugal concrete pipe piles instead of steel pipe piles is estimated to save more than 30,000 tons of steel; instead of ordinary centrifugal concrete pipe piles, it can save more than 10,000 tons of steel. It can be seen that using prestressed concrete piles to save steel and save money is of great significance. Some technical aspects of prestressed concrete piles
其他文献
建筑业是我国国民经济的支柱产业,党中央、国务院高度重视建筑业的健康发展,经过30多年的改革发展提高,建筑业的建造能力不断增强,产业规模不断扩大。日前,国务院办公厅印发
以循环流化床发生爆管的20G水冷壁管材作为研究对象,通过宏观检查、硬度检测、金相分析、扫描电镜和能谱(SEM+EDS)检验,分析了其失效的原因。结果表明,管材内侧异常氧化层(积
当你们看到这一期《小读者》时,正值新年开始、学期近末。同学们正在紧张复习,准备迎考。你们《小读者》的执行主编杨宗先生一定要让我以复习迎考为题,向小读者们说几句话。
现在关于领导科学的著述很多,领导科学实践性极强,然而,既为科学,就离不开理论,但理论缺乏实践支持,又显得空泛,而仅堆砌着经验,心得,又难见深度,领导科学研究难度大,原因在此。 At pre
千年运河,潺潺泗水,片片杨林,百年实小。在千年古楚地坐落着一座古老而年轻的现代化学校——泗阳县实验小学。她汲取了水的灵动,继承了树的挺拔。百年的绵延,积淀了她的厚重
本文根据空气调节房间各个别围护结构的放热反应系数和辐射得热在房间的分配系数,提出了房间传递函数系数的另一种解法,并详细推导出有关公式。最后给出了计算示例。 In thi
[目的]探讨低剂量电离辐射诱导EL-4细胞适应性反应中DNA-PKcs基因的作用。[方法]EL-4细胞应用渥曼青霉素处理后接受低剂量0.075Gy预先照射,再分别进行较高攻击剂量照射(1.0,1
目的研究低聚壳聚糖对辐射损伤小鼠造血系统的防护作用研究。方法研究照射损伤小鼠的30d存活率及小鼠造血系统辐射损伤防护试验,指标有骨髓有核细胞数、骨髓有丝分裂指数、内
Fully developed flow and heat transfer in metal-foam filled tube with uniform wall temperature(UWT) is semi-analytically investigated based on the Brinkman–Dar