空间相干激光通信中目标位置误差的相干探测

来源 :光学学报 | 被引量 : 0次 | 上传用户:q5479333321
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
空间相干激光通信终端中的跟瞄(PAT)系统性能直接影响通信质量。在通用的相干接收机系统中加入CCD和图像处理软件,在对传输信号进行相干探测的同时可得到目标位置误差信息,实现发射光束的实时调整。给出了干涉场强的理论表达式以及图像参数与目标位置的关系式,并讨论了实际应用中波长抖动对位置误差探测精度的影响。通过计算机仿真,验证了目标位置相干探测原理以及波长扰动分析的正确性。 Tracking (PAT) system performance in spatially coherent laser communications terminals has a direct impact on the quality of communications. By adding CCD and image processing software to the common coherent receiver system, the target position error information can be obtained while coherently detecting the transmitted signal to realize the real-time adjustment of the emitted light beam. The theoretical expression of interference field strength and the relationship between the image parameters and the target position are given, and the influence of wavelength jitter on the detection accuracy of position error is discussed. Through computer simulation, the principle of coherent detection of target position and the correctness of wavelength disturbance analysis are verified.
其他文献
我国在80年就采用了同塔双回路,但使用的路段、数量都较少,对其研究也很少.虽然近些年较以前有了很大发展,但同国外相比仍有很大差距.本文介绍了国内、外同塔双回和同塔多回
基于国内出现几条220千伏送电线路同杆(塔)架设四回路,本文针对上述情况,对同杆(塔)四回路应用中,可能产生技术问题,进行了计算、分析、比较与研究. 本文从必要性着手,比
会议
阳城送出工程是我国二十世纪九十年代由能源基地向负荷中心长距离输电的交流输变电项目,全线约406km采用同塔双回路架设,为解决杆塔规划中双回路换位的问题,对双回路换位塔进
本文通过500kV双回路送电线路工程的统计数据分析论述了500kV送电线路的经济性和可靠性.给出了单回路送电线路与双回路线路经济性对比.同时也论述了双回路运行维护的方面的问
本文通过对导、地线补修管进行的试验研究,探求了导、地线断股数量与补修管长度之间的关系,为导、地线在施工及运行过程中能最大限度的利用补修管进行补修提供试验依据。
鸡西矿业集团公司张辰煤矿西三采区3
期刊
本文介绍,110kV长兴-横沙长江大跨越工程如何在没有试验条件的情况下,通过调查、分析、研究,设计导线防振方案,并达到预期效果.该工程,跨越档距1519m、跨越塔全高158.8m,导线
会议
人们对环境保护的问题越来越关注,本文从增强环保意识出发,论述了改进线路设计的几点措施,即推广500kV同塔双回输电线路,减少超高压走廊;压缩单回路走廊,降低对环境的影响;加
悬垂线夹的型式影响大跨越工程的运行安全和投资.因此国内外历来很重视.本文归纳分析了以往我国用过的各种型式的特点,并针对易北河大跨越业主所以决定采用耐张线夹悬垂挂法
三峡输变电工程建设总规模为500kV交直流送电线路9484km,交流变电容量22.75GVA,直流换流站容量18GW.工程建设总周期超过10年.本文综述了随着三峡输变电和全国电力系统联网工
会议