论文部分内容阅读
本文根据具体工程实例,结合工程量清单项目的设置及投标单价和总价的确定,分析了在勘察工程的招投标过程中,采用工程量清单所引起的风险。
Based on the concrete engineering examples, combined with the setting of the bill of quantities project and the determination of the unit price and the total price of the tender, the risk caused by using the bill of quantities during the bidding and bidding of the survey and engineering is analyzed.