论文部分内容阅读
1988年县水利局在陈垓灌区开始试行田间低压管道输水灌溉,取得初步成效后,接受山东省水利厅,省科委下达的管道浑水灌溉专题试验研究任务。至1990年,三年内建成由十三座管道灌溉站组成的万亩灌溉试验区。通过几年运行证明,工程规划设计合理,施工质量完全可靠、见效快、影响大,周围乡村自筹资金兴办管灌工程。至今已建成管道灌溉站47座、其中东平湖灌区4座,灌溉面积已达3万余亩(见附表)。
In 1988, the County Water Conservancy Bureau piloted the field low-pressure pipeline water transfer irrigation in the Chenxian Irrigation District. After initial success, it received the task of special pilot project of muddy water irrigation of pipeline issued by Shandong Provincial Department of Water Resources and Science and Technology Commission. By 1990, a 10,000-mu irrigation pilot zone consisting of 13 pipeline irrigation stations will be completed within three years. Through several years of operation proved that the project planning and design is reasonable, construction quality is completely reliable, quick, great impact, the surrounding villages self-financing set up irrigation and drainage projects. To date, 47 pipeline irrigation stations have been built, of which 4 are Dongpinghu irrigated areas, with an irrigated area of over 30,000 mu (see attached table).