论文部分内容阅读
为了生产更多更好的精馏锌,针对我厂现有设备能力不足,不能生产更多的优质产品的矛盾,广大革命职工遵照伟大领袖毛主席“打破洋框框,走自己工业发展道路”的伟大教导,大搞技术革新和技术革命,大胆进行了塔体工艺改革,即在一个燃烧室内放两套塔盘取得了成功。自1971年10月4日投产以来的生产实践证明,其主要效果是:高产优质、低消耗。改革前一个塔的日产量为15(吨/日),而改革后一个双盘(单炉)日产量为30(吨/日)以上。比改革前
In order to produce more and better distilled zinc, in view of the incompatibility of the existing equipment in our factory and the inability to produce more high-quality products, the majority of revolutionary workers follow the principle of “breaking the framework of the world and taking the road of industrial development” by the great leader Mao Zedong. Great teaching, engage in technological innovation and technological revolution, boldly carried out the tower process reform, that is, put two sets of trays in a combustion chamber and achieved success. Since October 4, 1971 put into operation since the production proved that its main effect is: high yield, low consumption. The daily output of the first tower before the reform was 15 (t / d), while the daily output of a double-deck (single-furnace) after the reform was above 30 (t / d). Before the reform