论文部分内容阅读
现在投入使用的楼房有相当部分存在着质量问题,其中住户反映比较普遍的是室内排水系统漏水问题。所以建筑给排水工程是建筑安装工程的重要组成部分,也是影响建筑质量的重要因素。新建的给排水系统安装结束,正式投入使用前,需要对系统进行调试,这对于检验设计是否正确、设备性能是否符合要求、施工质量是否可靠,都是必不可少的环节,是保证给排水管道系统使用功能的关键措施。
Now put into use a considerable part of the building there is a quality problem, which is more common household reflects the indoor drainage system leakage problem. Therefore, building water supply and drainage engineering is an important part of construction and installation projects, but also affect the quality of the building an important factor. Before the new water supply and drainage system is installed, it is necessary to debug the system before putting it into use. This is an indispensable part of the system for verifying whether the design is correct, whether the performance of the equipment meets the requirements, whether the construction quality is reliable, and whether the water supply and drainage pipes System using the key features of the measures.