论文部分内容阅读
路基沉降是高速铁路客运专线路基沉降预测工作的重要内容,也是保证高速铁路客运专线安全运行的重要手段。但是,在铁路客运专线路基沉降预测的过程中,由于工作人员对铁路客运专线路基沉降预测工作的重要性,并没有足够的认识,对其重要性并没有进行全面的了解,所以在铁路客运专线路基沉降预测的过程中,对其所涉及到的方式方法,没有进行有效的应用。这样就导致铁路客运专线路基沉降预测的过程中,其方式方法在应用过程中会存在着一定程度上的误区,使铁路客运专线路基沉降预测的作用无法得到全面的展现。因此,本文对高速铁路客运专线路基沉降预测的方式方法,进行了简要的分析和阐述,希望对高速铁路路基工程沉降控制方面的发展,起一定的帮助与借鉴。
Subgrade settlement is an important part of settlement prediction of high-speed railway passenger dedicated subgrade, and also an important means to ensure the safe operation of high-speed railway passenger dedicated line. However, in the process of railway subsidence prediction for railway passenger dedicated line, due to the importance of staff in the prediction of roadbed subsidence for railway passenger dedicated line, there is not enough understanding and understanding of its importance. Therefore, in railway passenger dedicated line In the process of subgrade settlement prediction, the methods and methods involved in it are not effectively applied. As a result, there are some misunderstandings in the application of the method and method in the subgrade settlement prediction of railway passenger dedicated line, so that the function of subsidence prediction of railway passenger dedicated line can not be fully demonstrated. Therefore, this paper analyzes and expounds the method of subgrade settlement prediction of high-speed railway passenger dedicated line in the hope of hope for some help and reference for the development of subsidence control of high speed railway subgrade engineering.