论文部分内容阅读
The project-New Gathering Center 27 and 28 with a 260-kilometr-long pipeline for the oil field in the western part of Kuwait,contracted by China Petroleum Engineering & Construction (Group) Corporation (CPECC),were put into operation in December 2000